The Making of 410Gallery Plus

Interior work will begin on July 31, 2026, and will continue until the opening on September 5.

プラス オープン入口画像_edited.jpg
プラス オープン入口画像_edited.jpg
IMG_4398_edited.jpg
IMG_0781 (1)_edited.jpg

September 4, 2026

410Gallery Plus Grand Opening.

Thank you so much for all the flowers.

スクリーンショット 2026-09-02 19.06_edited.jpg
スクリーンショット 2026-09-02 19.07_edited.jpg
スクリーンショット 2026-09-02 19.07.25.png

September 2, 2026

The gallery exhibition room is now complete.

The pre-opening will be on September 4th from 3 PM to 5 PM.

IMG_8014_edited.jpg
IMG_8011_edited_edited.jpg

September 1, 2026

We installed a counter.

b17db8c9d69ae2a0f883a404befad96d_edited.png
b9906de3e8f16762428c27186ba6341f_edited.jpg
bde3288ecc94e5d8ee5771e168786e59_edited_edited_edited_edited_edited_edited.jpg

August 27, 2026

We have installed a sign.

スクリーンショット 2026-08-23 18.23.05.png
スクリーンショット 2026-08-23 18.34_edited.jpg
IMG_7972_edited.jpg

August 23, 2026

The floor replacement is complete.

スクリーンショット 2026-08-21 12.55_edited.jpg
スクリーンショット 2026-08-21 12.54_edited.jpg

August 21, 2026

The display stand has arrived.

IMG_7960_edited.jpg
IMG_7962_edited_edited.jpg
IMG_7961_edited_edited_edited.png

August 19, 2026

Detailed work by the staff.

30d182b3d6095a64d95e7ba9ad191206_edited.jpg
f48d887b6902ba26a310801b8a9e241f_edited.jpg
be759973ef01bd84be992f6ada75d105_edited.jpg

August 16, 2026

Precise adjustment of the lighting rail using a spirit level.

a71296ba59f71ed77b200460a827d595_edited_edited.jpg
スクリーンショット 2026-08-11 18_edited.jpg

August 11, 2026

The white walls are now complete.

IMG_7903_edited.jpg
IMG_7905_edited.jpg
IMG_7912_edited.jpg

August 9, 2026

The construction of the white walls is progressing.

IMG_7887_edited.jpg
IMG_7891_edited_edited.jpg

August 7, 2026

Day 1 of creating the white wall.

IMG_7876_edited_edited.jpg
IMG_7875_edited.jpg
764372989_1033292902996881_6105135629818458225_n_edited.png

August 6, 2026

The priming process for the paint has begun.

The automatic doors have been adjusted and preparations for the opening are underway.

760401122_1076473641571362_3539061229329387630_n_edited.jpg
763416949_4586933611540297_3142041460033529292_n_edited.jpg
IMG_7864_edited.jpg

August 5, 2026

Construction of the walls and ceilings is progressing steadily.

Preparations for the opening are progressing smoothly.

410Gallery Plus was featured in an interview by "Monthly Hakata" magazine.

It will be published in the September 1st issue. Please be sure to check it out.

8_edited_edited.jpg
8_edited.jpg
8_edited_edited.jpg

August 3, 2026

The movable wall is nearing completion.

The wall is being filled with putty. Apparently, the puttying process involves filling and sanding three times.

756846460_915829217614406_3528915452126681291_n_edited.jpg
758239017_2407809799742511_7143629144238911612_n_edited_edited.png

August 2, 2026

We have put up an OPEN announcement poster.

Please stop by and take a look if you're in the area.

IMG_7841 2_edited.jpg
IMG_7839 2_edited.jpg
IMG_7837 2_edited.jpg

August 1, 2026

Construction of the wall has begun.

Construction is progressing thanks to the meticulous work of the craftsmen.

07.31_edited.jpg
07.31_edited.jpg
07.31_edited.jpg

July 31, 2026

There was a blue tarp on the floor.

We started by removing the old wallpaper from the interior.